Skip to main content
N.C. Division of Water Quality
About the Division of Water Quality | Accesskey = a Contact Us | Accesskey = c Division of Water Quality Sections | Accesskey = s Glossary | Accesskey = g
To preserve, protect and enhance North Carolina's water... dwq banner

Navigation Links

Modeling and TMDL Unit :: Special Studies

Mercury

  2002-2003 NC Eastern Regional Mercury Study - Interim Handout (24KB)
  2004-2006 NC Mercury Study Extension (2.27MB) adobepdf

Return to Top

High Rock Lake  

Field Study and Modeling Plan for High Rock Lake Chlorophyll a and Turbidity Total Maximum Daily Load (TMDL) v1.5 - November 2007

High Rock TMDL Monitoring Plan (April 2008-March 2010) - updated 3/18/08

Water Quality Data Review for High Rock Lake (August 2004 1.87 MB) PDF
Yadkin Project FERC Relicensing Website (Alcoa:Yadkin-APGI)

High Rock Lake Scoping Study (January 2005)

High Rock Lake Scoping Study (May 24, 2005 Presentaion)

High Rock Background  (May 24, 2005 presentation)

High Rock Kickoff  Meeting (May 24, 2005 presentation)

Nutrient Criteria Implementation Plan

2005-2006 High Rock Lake Scoping Study Data Review - Presented January 22, 2007 to the High Rock Technical Advisory Committee

 

Return to Top


Jordan Lake

  Jordan Lake Stakeholder Project (link)

  Jordan Lake Watershed Model Development (Large File: 5,073KB)
 
  Jordan Lake Nutrient Response Model Enhancement  (Large File: 4,950KB)
  
  Jordan Additional Target Analysis
and Figures

  Nitrogen and Phosphorus Delivery from Small Watersheds to Jordan Lake

  Point Source Delivery Model for Jordan Lake

  Jordan Lake Nutrient Response Model (zipped file)

  Jordan Lake Nutrient Response Modeling Project: Existing Data Memorandum (zipped file)

  Jordan Lake Nutrient Response Model Uncertainty

Return to Top

 


Falls of Neuse Lake  

Final Falls Lake Nutrient Response Model Report PDF
Final Falls Lake Watershed Model Report - October 2009 PDF
Falls Lake Stakeholder project (link)

2005 Monitoring Plan for Falls of Neuse Reservoir (Neuse River Basin)PDF
2006 Monitoring Plan for Falls of Neuse Reservoir (Neuse River Basin)

Addendum to the Monitoring Plan for Falls of the Neuse Reservoir (Neuse River Basin)

Return to Top

 Stressor Studies

DWQ Watershed Assessment Report for Upper Swift Creek New
NCEEP Upper Swift Creek Local Watershed Plan New

Corpening Creek (Catawba River Basin) - 2004
  
Burnt Mill Creek (Cape Fear River Basin) - 2004 
Clayroot Swamp (Neuse River Basin) - 2004
West Fork French Broad River (French Broad River Basin) - 2004


Return to Top


Bacteria

Piedmont-Coastal-BST Report

Piedmont-Coastal BST Results- MapTech Presentation (2pp Apr05)

Draft_Final_Muddy & Salem-BST_V11

Draft_Final_Piedmont-Coastal-BST_V14

Return to Top