Skip to main content
N.C. Division of Water Quality
About the Division of Water Quality | Accesskey = a Contact Us | Accesskey = c Division of Water Quality Sections | Accesskey = s Glossary | Accesskey = g
To preserve, protect and enhance North Carolina's water... dwq banner

Navigation Links

Stormwater Unit :: Fee Schedule

On July 31, 2007, the North Carolina General Assembly put into effect a new budget that included a 20% increase to most fees associated with Division of Water Quality permit renewals, permit modifications, certifications, and project fees.  The change does not affect SOC fees.  (Express permitting fees for non-discharge permits may be changed at a later date.) DWQ will not process applications with previous fee amounts beginning September 1, 2007.

Activity
(Category A) See Notes 1,2

New Permit Application Fee / Annual Fee

Major Modification Fee
See Note 3

Major Individual NPDES Permits

$3,440

$1030

Minor Individual NPDES Permits

$860

$260

Single-family Residences NPDES

$60

$20

Stormwater and Wastewater Discharge General Permits NPDES

$100

Not Applicable

Recycle Systems

$360

$110

Animal Permits(Small Operations)

$60

Not Applicable

Animal Permits (Medium Operations)

$180

Not Applicable

Animal Permits (Large Operations)

$360

Not Applicable

Nondischarge Major Permits

$1,310

$395

Nondischarge Minor Permits

$810

$245

Activity
(Category B) See Note 1

Additional Annual Fee
See Note 4

Project Fee
See Note 4

Special Order by Consent – Major

$500

$400

Special Order by Consent – Minor

$400

$250

Activity
(Category C) See Note 1

Project Fee
See Note 5

Sewer Extensions

$480

Water Quality Certifications – Major

$570

Water Quality Certifications – Minor

$240

Petroleum Contaminated Soils

$480

State Stormwater:

Regular - New App. & Major Mod. (H & L)

$505

Regular - Redevelopment Exclusion
No fee

Express - New App. & Major Mod. (L)

$2,000

Express - New App. & Major Mod. (H)

$4,000

Express - Minor Mod. (L)

$1,000

Express - Minor Mod. (H)

$2,000

Express - Offsite (H)

$2,000

Express - General

$1,000

Express - Plan Revision (H or L)

$500

Express - Redevelopment Exclusion
$500

Miscellaneous Activities

Project Fee

Permit Renewal

$505 for State Stormwater Renewals
No Fee for NPDES Renewals

Authorization to Construct

No Fee

Minor Permit Modification

No Fee

Notes:

  1. Refer to the definitions below for specific descriptions of each activity category.
  2. For new permit requests under activities listed in Category A, a fee equivalent to the corresponding annual fee is required. This fee is non-refundable if the permit request is denied. If the permit is granted, this fee applies as the annual fee for the first year after permit issuance.
  3. This fee is non-refundable if the permit request is denied. A major modification shall be defined as one that increases the volume, increases the pollutant load, results in a significant relocation of the discharge point, or results in a change in the characteristics of the waste generated.
  4. These fees shall be in addition to the associated annual fee as listed under Category A.
  5. This fee is non-refundable if the permit request is denied.

 

Definitions of Permitted Activites:

Major Individual NPDES Permits
>= 1.0 million gallons per day. Industries with high toxic potential; municipalities with pretreatment programs; municipal stormwater permits.

Minor Individual NPDES Permits
< 1.0 million gallons per day. Industries with low toxic potential; municipalities; small domestic waste facilities; industrial stormwater permits.

Single Family Residences
All individual systems covered under NPDES General Permit Number NCG550000 and non-discharge single family residential systems.

Stormwater and Wastewater Discharge General Permits
Facilities covered under statewide General NPDES Permits. Common examples include: mine dewatering, cooling water, vehicle maintenance activities, etc.

Recycle Systems
Must be complete closed-loop recycle system.

Animal Permits (Small Operations)
38,500 to 99,999 Steady State Live Weight

Animal Permits (Medium Operations)
100,000 to 799,999 Steady State Live Weight

Animal Permits (Large Operations)
> 800,000 Steady State Live Weight

Nondischarge Major Permits
> 10,000 gallons per day or > 300 acres of land required.

Nondischarge Minor Permits
< 10,000 gallons per day or < 300 acres of land required.

Special Order by Consent – Major
Refer to categories described above for Major facilities.

Special Order by Consent – Minor
Refer to categories described above for Minor facilities.

Sewer Extensions
Collection system construction or extension to an existing system.

State Stormwater
New development in the 20 coastal counties.  New development located throughout the state near designated sensitive waters (i.e. High Quality Waters, Outstanding Resource Waters).  New development throughout the state in Phase II Post-Construction areas.

    • Express – Express stormwater permitting program only available in the 20 coastal counties.
    • H – High density project
    • L – Low density project

Water Quality Certifications – Major
> 1.0 acre wetland fill, > 150 feet stream impacts

Water Quality Certifications – Minor
< 1.0 acre wetland fill, < 150 feet stream impacts

Petroleum Contaminated Soils
Removal, treatment and disposal of petroleum-contaminated soils.

 

 

If you have comments or suggestions, contact SWGPU Webmaster.  

Page last updated May 18, 2009